|
|
Shanxi Hydraulic Construction Engineering Bureau (SHCEB)
is a hydroelectric engineering construction
enterprise with a certificate of State Grade A.
It has 51.74 million RMB yuan of registered
funds and 188.15 million RMB yuan of fixed
asset. There are 14 engineering divisions and
one logistic center. Presently SHCEB employs
3105 permanent staff and workers, in which 784
technical staff, amounting to 50%, have senior
or middle level technical titles. 2357 sets of
construction equipment are available for earth
and rock excavation, foundation treatment,
highway and bridge construction, transportation
and so on, which total rated power capacity is
up to 40,272 KW and its annual construction
capacity is 500 million RMB yuan.
SHCEB was established in 1958 and put into
action in April, 1960 formally. During the five
decades, SHCEB staff and workers have
experienced hardships and arduous journey,
constructing in many places in Shanxi and other
provinces of China, participating in the
construction of more than 100 of large and
medium sized hydroelectric projects which
amounts to over 200 works. Guided by the market
and powered by the technical innovation, SHCEB
has developed itself in various fields based on
its good quality brands and the hydraulic
construction experience since the Reform and
Open-up. Quite a few projects completed by SHCEB
were evaluated as provincial or ministerial
super-quality works, and SHCEB itself were
awarded the good qualification enterprise many
times. Now, SHCEB has become a comprehensive
construction enterprise specializing in the
construction of large and middle-scale sluices,
dams, bridges, culverts, channels, aqueducts,
tunnels, highways and foundation treatment,
equipment installation and fabrication of metal
works, which annual production capability can
reach up to 600 m3 of earthwork and rockworks,
0.8 million m3 of concrete works and 5000 tons
of installation and fabrication of metal works.
SHCEB regards quality as a life of the
enterprise. It has determined the quality
objective of a scientific management, elaborate
construction, striving toward being a national
superior and keeping at the provincial level,
and the policy of Quality, Credit and Good
Service First while the health comprehensive
system of quality, environment and business was
building. In 1998, the length of the single
concrete core sample drawn from the rolled
concrete dam of the second Fenhe river reservoir
was made a record in its history, the quality of
the RC dam reached the advanced level in China.
The construction quality of the pump station,
tunnel and PCCP installation in Wanjiazhai
Yellow River Diversion Project was so good and
the construction speed was so fast that SHCEB
was awarded a outstanding unit by the provincial
labor evaluation committee. Honesty and
contributing to the society are the core of
SHCEB's principle. SHCEB emphasizes scientific
and technological improvement and was awarded
the Shanxi Scientific and Technological
Achievements Prize and the National Excellent
Welding Quality Prize many times.
In
2003, TBM and its technology were introduced in
SHCEB, and now the bureau is the first
enterprise who owns TBMs and has a good
knowledge of the operation technology. The
machines and technology have been used in
Wanjiazhai Yellow River Diversion Project,
Tashan Main Tunnel and Tongxinjingtian Tunnel of
Datong Mine Bureau, and Xinjiang 81 Daban Tunnel
Project.
During the Eleventh five-year plan, SHCEB will
hold on the strategy of specializing in one and
developing in various fields. Reforming deeply,
SHCEB will take the opportunity to develop. It
is the SHCEB's mottos that leaders should act
fairly and honestly, staff full of youthful
spirit and workers have high ambitions to create
a enterprise culture of honesty, solidarity,
endeavor and excellence. SHCEB will increase its
innovation ability and improve its scientific
management to achieve a more glorious future. |
|